we appeared before dpw on june 6 and we were told there would be a verdict two weeks later. we have been waiting since and we being a dozen people showed up for the first hearing, 10 people showed up for the second, none of us were notified with the exception of mr. bob bessa who last week received a phone call from supervisor campos' office. dpw promised to let us know in two weeks and this notice arrived saturday for this hearing today. there are fuer russ people in our group and the northeast slope who were unable to rearrange their work scheduled for monday to be here. we definitely need a continuance. that's the first point i'd like to make. the second point is one illustrated by the overhead, if you would please switch to the overhead. now, this is the proposed garage and the proposed cut for the driveway. what you are not seeing is the existing wall and the existing curb, which stop the water from flowing into the houses down on hampshire that is our main objection and has always been our objection. we have seen this curb cut. it is not going to be adequate to stop th